Sector Expertise
Construction & Contracting
Construction, supply, claims and arbitration for building and infrastructure projects in the Kingdom.
Construction runs on complex contracts, supply chains and critical timelines. We support contractors, owners, consultants and suppliers from structuring the project and drafting the contract through managing variations and claims to resolving disputes — protecting the programme, cash flow and contractual rights.
Key Legal Matters
Key legal matters in the sector
Construction and subcontract agreements
Drafting and reviewing scope, payment, handover, warranties and risk allocation.
Variations and claims
Documenting changes and managing extension-of-time and cost claims before they become disputes.
Delay and liquidated damages
Assessing causes of delay and each party's responsibility; defending or pursuing delay damages.
Bonds, certificates and retention
Performance and advance-payment guarantees, retention, and recovery of overdue payments.
Disputes and arbitration
Representing parties before courts and arbitral tribunals in project disputes.
Watch Points
Watch points in this sector
Claim notices on time
Many contracts require written notice within a set period for delay or change; missing the period may weaken or forfeit the claim.
Order of precedence of contract documents
If the ranking of the contract, special conditions, specifications and schedules is not fixed, conflicts between them become a source of dispute.
Conditional payment to subcontractors
Tying a subcontractor's payment to the owner's payment of the main contractor needs careful drafting, so payments do not freeze and the main contractor is not exposed to claims it cannot recover.
Regulators
Relevant regulators
Saudi Contractors Authority
Contractor classification and regulation of the trade
Ministry of Municipal, Rural Affairs and Housing
Municipal permits and building requirements
Etimad platform (Ministry of Finance)
Government tenders, procurement and contracts
Saudi Council of Engineers
Registration of engineers and consulting offices
Saudi Center for Commercial Arbitration (SCCA)
Arbitration of project disputes
Typical contracts and documents
- Construction contract (lump sum or remeasurement)
- Subcontract
- Engineering consultancy and supervision agreement
- Supply and installation contracts
- Performance and advance-payment guarantees
- Initial and final handover records
FAQ
Frequently asked questions
When can a contractor claim an extension of time?
It depends on the contract terms, the notices required and the cause of delay. Record the event in writing and within the contractual period before submitting the claim.
Can liquidated damages be reduced?
Possibly, where the delay was caused by the other party or the amount is out of proportion to the actual loss. It is assessed on the facts of each case.
Court or arbitration?
Usually set by the dispute-resolution clause, the size of the dispute, the speed needed and the nature of the evidence. We review the clause and recommend the route.
Who is responsible for defects after handover?
Look first to the contract and then to the defects provisions of the Civil Transactions Law; the period and liability vary with the nature of the work. Handover records and inspection notes should be documented carefully.
Is a bank guarantee independent of the contract?
Guarantees are often drafted as independent on-demand undertakings, but the final effect depends on the wording of the guarantee itself. Review it before signing and before any demand or objection.
The information on this page is general and for awareness only; it is not legal advice and does not create an attorney–client relationship. Answers vary with the facts of each case.
Insights
Articles worth reading
مراجعة العقد التجاري قبل التوقيع: ما الذي ينبغي فحصه؟ (Arabic)
دليل عملي لمراجعة العقد التجاري قبل التوقيع، يشمل الصلاحيات ونطاق العمل والمقابل والتسليم والمسؤولية والفسخ والقوة القاهرة والإثبات وتسوية النزاعات.
الإخلال بالعقد والتعويض في السعودية: متى يستحق وكيف يُقدّر؟ (Arabic)
شرح التعويض عن الإخلال بالعقد في السعودية، بما يشمل عدم التنفيذ والتأخير والضرر المتوقع وفوات الكسب والإعذار والشرط الجزائي وحدود المسؤولية.
الشرط الجزائي في العقود السعودية: متى يستحق ومتى يمكن تخفيضه أو زيادته؟ (Arabic)
شرح الشرط الجزائي والتعويض الاتفاقي في السعودية، ومتى يستحق، وحالات تخفيضه أو زيادته، وأثر عدم وقوع الضرر والتنفيذ الجزئي والتأخير.
The arbitration clause in commercial contracts: how to draft it precisely
What makes an arbitration clause valid and effective? Essential elements, common drafting mistakes and the questions to ask before adopting one.
الإثبات في القضايا التجارية في السعودية: ما الأدلة التي تبني القضية؟ (Arabic)
شرح عملي للإثبات في القضايا التجارية بالسعودية، بما يشمل العقود والمراسلات والبريد الإلكتروني والدليل الرقمي والدفاتر التجارية والإقرار والشهادة والخبرة.
Arbitration at the SCCA: what happens from the request for arbitration to the award?
A practical guide to SCCA institutional arbitration: starting the case, forming the tribunal, expedited and emergency procedures.
Does your business operate in this sector?
Send a short summary of your matter and we will agree scope and deliverables from the start, replying within one business day.